We had done some work on it a few years ago...namely stripping wallpaper, painting the walls, painting the vanity and medicine cabinet. It was a little superficial re-do. This time around, we decided to do a gut job. I think we have been watching too many shows on HGTV.
I forgot to take a picture before I started ripping out the storage shelves but you can get a basic idea of the "before"...
It's not a very big bathroom but it was a big enough job. Jeff tore out the vanity, shoveled up the peel n stick tile, removed the toilet and medicine cabinet. After the gutting was done, all that remained was the tub, the walls and a hole where the toilet should connect to the floor.
I will skip all the details and just say that we had to wait a week for a plumber to come and re-install the toilet flange and give us back our "facilities". In the meantime, we painted the walls a lighter, neutral color, cut and re-cut baseboards and installed them, put in the vanity with new sink and faucet and medicine cabinet. 
Finally, we have a completed bathroom. It is so hard to take a good "after" picture of a room that is like 6 ft x 4 ft.

See the gorgeous floor?!?! I think it just looks prettier to me because it was such a collaborative effort between Jeff and I.
It's not perfect by any means. There are some areas that we had to fill with grout cause some of my cuts were off. There is still some places we dinged the paint when we were finishing the installation of baseboards and things. There are some accessories to be added. But all in all, I think we will call it a success.
Finally, we have a completed bathroom. It is so hard to take a good "after" picture of a room that is like 6 ft x 4 ft.